Georgia municipality (via BidNet Direct)Police Station Renovation & Training Facility / EOC — Construction Manager at Risk·~Not disclosed·Open (no set-aside)·CLOSES OCT 15Worth County SchoolsWorth County Middle School — facility renovations & modifications (interior demo, finishes, MEP; roofing + site work)·~Not disclosed·Open (no set-aside)·CLOSES OCT 8City of Sylvania2026 Sylvania Street Improvements (PE26186) — ~3.42 miles asphalt resurfacing: milling, tack, patching, leveling, overlay, striping·~Not disclosed·Open (no set-aside)·CLOSES OCT 1Gwinnett County GovernmentGwinnett County Public Library — Collins Hill Branch parking lot improvements (mill & overlay at ADA stalls; crack-fill, seal, stripe)·~Not disclosed·Open (no set-aside)·CLOSES SEP 29City of HinesvilleIrene B. Thomas Park inclusive playground renovation — turnkey: design, demolition, equipment install, safety surfacing, permitting·~Not disclosed·Open (no set-aside)·CLOSES SEP 25City of GrovetownEast Robinson Avenue sidewalk improvements — new sidewalk, stormwater infrastructure, utility relocation, erosion control·~Not disclosed·Open (no set-aside)·CLOSES SEP 24USDA Forest Service — Southern Research StationNorth Building HVAC repair — actuators, fan-coil fan motors, air-handling unit components (two-story office/research building)·~Not disclosed·Federal — check SAM.gov for set-aside·CLOSES SEP 23Municipal gas utility (via BidNet Direct)Buford Highway natural gas main replacement (PHMSA grant) — ~16,500 LF of 6-inch high-pressure steel main, trenched/untrenched, valves·~Not disclosed·Open (no set-aside)·CLOSES OCT 8Rolling Opportunities — Updated Weekly · Members Get The Links
Georgia municipality (via BidNet Direct)Police Station Renovation & Training Facility / EOC — Construction Manager at Risk·~Not disclosed·Open (no set-aside)·CLOSES OCT 15Worth County SchoolsWorth County Middle School — facility renovations & modifications (interior demo, finishes, MEP; roofing + site work)·~Not disclosed·Open (no set-aside)·CLOSES OCT 8City of Sylvania2026 Sylvania Street Improvements (PE26186) — ~3.42 miles asphalt resurfacing: milling, tack, patching, leveling, overlay, striping·~Not disclosed·Open (no set-aside)·CLOSES OCT 1Gwinnett County GovernmentGwinnett County Public Library — Collins Hill Branch parking lot improvements (mill & overlay at ADA stalls; crack-fill, seal, stripe)·~Not disclosed·Open (no set-aside)·CLOSES SEP 29City of HinesvilleIrene B. Thomas Park inclusive playground renovation — turnkey: design, demolition, equipment install, safety surfacing, permitting·~Not disclosed·Open (no set-aside)·CLOSES SEP 25City of GrovetownEast Robinson Avenue sidewalk improvements — new sidewalk, stormwater infrastructure, utility relocation, erosion control·~Not disclosed·Open (no set-aside)·CLOSES SEP 24USDA Forest Service — Southern Research StationNorth Building HVAC repair — actuators, fan-coil fan motors, air-handling unit components (two-story office/research building)·~Not disclosed·Federal — check SAM.gov for set-aside·CLOSES SEP 23Municipal gas utility (via BidNet Direct)Buford Highway natural gas main replacement (PHMSA grant) — ~16,500 LF of 6-inch high-pressure steel main, trenched/untrenched, valves·~Not disclosed·Open (no set-aside)·CLOSES OCT 8Rolling Opportunities — Updated Weekly · Members Get The Links
Join →
← All courses

Run it

Construction Project Coordinator

Sixteen modules that take someone with no construction background to job-ready coordinator — the paperwork, the schedule, the money, the closeout.

Who it’s for

New coordinators, assistant PMs, and tradespeople moving into the office side.

What you leave with

Run the documentation, scheduling and cost side of a real project from bid to closeout.

Access

Module 1 is free with an account. Members open all of it.

Join — $149/mo →
01

Intro to Construction & the Project Lifecycle

How a project actually moves from idea to closeout, and where a coordinator lives inside it.

Free
02

Construction Safety — the coordinator's role

OSHA-10 fundamentals and the documentation that keeps a site (and a company) safe.

🔒 Members
03

Blueprint & Spec Reading

Reading plans and specifications well enough to catch what the field will ask about.

🔒 Members
04

Construction Documents — submittals & RFIs

The submittal and RFI process end to end, with the logs that keep it honest.

🔒 Members
05

Communication, Meetings & Field Documentation

Agendas, minutes, daily reports and the 'Route-It' habit that keeps information moving.

🔒 Members
06

Intro to Scheduling — CPM & look-aheads

Critical path basics and the two-week look-ahead a coordinator owns.

🔒 Members
07

Intro to Estimating & Takeoffs

Quantity takeoffs, bid leveling and the numbers behind a price.

🔒 Members
08

Construction Technology — Procore, Bluebeam, Excel

The tools a coordinator runs every day, and how to set them up right.

🔒 Members
09

Advanced Document Control

Versioning, transmittals and the audit trail that protects the job.

🔒 Members
10

Procurement & Subcontractor Management

Buying out the job, COIs, and managing subs without the drama.

🔒 Members
11

Cost Control, Budgets & Pay Apps

Cost codes, budget-vs-actual and the monthly pay app done correctly.

🔒 Members
12

Quality Control & Inspections

Inspection planning, punch lists and closing quality issues fast.

🔒 Members
13

Advanced Scheduling & Delay Analysis

Recovery schedules and documenting delay so it holds up.

🔒 Members
14

Contracts, Risk & Compliance

Contract types, risk transfer and the compliance items that get you removed from a job.

🔒 Members
15

Closeout & Handover

The closeout package, retention release and a clean handover.

🔒 Members
16

Division 09 Finishes — capstone

A full capstone project with rubric: coordinate a finishes package from bid to closeout.

🔒 Members